All 56 schedules56
- Onshore gas processing plant EPC: Level 3 schedule · 180 activities
- Engineering deliverables schedule: Level 4 with review cycles · 213 activities
- Procurement schedule: fifteen packages from requisition to site · 231 activities
- Piping spool fabrication shop schedule · 88 activities
- Piping erection and test package schedule · 114 activities
- Mechanical equipment installation: static and rotating · 99 activities
- Electrical and instrumentation construction schedule · 77 activities
- Pre-commissioning, commissioning and start-up by system · 140 activities
- Storage tank farm (API 650 tanks) · 95 activities
- Cross-country pipeline: spread schedule with ladder logic · 88 activities
- HDD crossing and tie-ins · 40 activities
- Offshore platform: detailed jacket and topsides schedule · 82 activities
- Plant turnaround: hour-by-hour critical path · 50 activities
- Brownfield revamp: SIMOPS, hot taps and a tie-in shutdown (detailed) · 55 activities
- Combined-cycle gas turbine (CCGT) power plant: detailed schedule · 129 activities
- Utility-scale solar PV plant (200 MWp) · 89 activities
- Onshore wind farm (16 turbines) · 188 activities
- High-voltage substation (132/33 kV): detailed schedule · 48 activities
- Overhead transmission line (100 towers) · 46 activities
- High-rise residential tower (24 floors) · 332 activities
- Villa compound (12 villas) · 176 activities
- Hospital: MEP-intensive building · 142 activities
- Steel-framed warehouse (pre-engineered building) · 61 activities
- Data centre (8 MW IT): detailed schedule with five commissioning levels · 79 activities
- Dual carriageway highway (18 km): detailed schedule · 83 activities
- Highway bridge (6 spans, precast girders) · 82 activities
- Bored tunnel with TBM (4 km): detailed schedule · 52 activities
- Metro station (top-down cut and cover): detailed schedule · 54 activities
- Railway track, OLE and signalling · 51 activities
- Water treatment plant: detailed schedule · 110 activities
- Sewer network with open cut and microtunnelling · 44 activities
- Port quay wall and container berth · 54 activities
- Dredging and land reclamation · 35 activities
- Airport runway (4 km): detailed schedule · 87 activities
- Shipbuilding: block construction to delivery · 138 activities
- Dry-dock ship repair (in hours) · 31 activities
- FPSO conversion: detailed schedule · 82 activities
- Structural steel fabrication shop · 47 activities
- Pressure vessel fabrication (ASME VIII) · 50 activities
- Power station boiler outage (in hours): detailed schedule · 39 activities
- Mining project: mine development and concentrator (detailed) · 72 activities
- Telecom network rollout (96 sites) · 84 activities
- Office fit-out (three floors) · 45 activities
- Concrete gravity dam: detailed schedule by block and lift · 67 activities
- Seawater reverse osmosis desalination plant: detailed schedule · 67 activities
- Pharmaceutical sterile facility: detailed construction and qualification schedule · 53 activities
- Onshore well hook-up, flowlines and remote manifold · 135 activities
- Subsea pipeline and riser installation · 30 activities
- FEED phase schedule · 93 activities
- EPC tender (bid) schedule · 63 activities
- LNG liquefaction train · 69 activities
- Full-containment LNG storage tank · 54 activities
- Carbon capture and storage (capture, compression, pipeline, injection) · 39 activities
- Ammonia plant (steam methane reforming) · 47 activities
- District cooling plant and network · 44 activities
- Artificial island for offshore field development · 22 activities